2 part repair cartridge developed to be dry to the touch in roughly 9 min. at 75°F (23°C). This saves time on the small repairs and allows for holiday testing, “Jeepingâ€, of repaired coating in 15 minutes.
VCP Sales specializes in corrosion prevention at pipelines, storage tanks, soil to air transitions, above ground flanges, pipe crossings, and in the ditch applications.